Product Finder

Market

Application

Type of Product

Case Studies

PW1 TRACKBED SEPARATOR – Beaulieu Park Station (Network Rail)

Terram PW1 trackbed separator in use at Beaulieu Park Station, Chelmsford

Overview

Project

Beaulieu Park Station

Location

Chelmsford

Client

Network Rail

Product

PW1 Trackbed Separator

Product

PW1 Trackbed Separator

Application Function

Filtration & Separation, Stabilisation

Market Sector

Railways

Product Solutions

Beaulieu Park is the first railway station to be built on the Great Eastern Main Line for over 100 years.  Due to be completed in 2025, it will provide essential transportation infrastructure required for housing and economic expansion to Chelmsford city’s north. 

Crucially, it will ease congestion at Chelmsford station, minimise automobile travel into the city, lower congestion on local roads, and help in reducing pollution while making travelling into London faster and more convenient.

As a vital link between Chelmsford, Braintree, London Stansted Airport, and the outlying areas, Beaulieu Park will increase railway access by providing regular connections to the capital in just 40 minutes from London Liverpool Street station, and other places in the east England. 

The Solution

In the trackbed construction, Network Rail specified the use of the TERRAM PW1 trackbed separator to maintain separation between the sand/subgrade and ballast layers. 

Terram PW1 trackbed separator prevents the upward movement of fine sub-grade particles and the intermixing of ballast with the blanket, which might otherwise compromise track stability and performance.

Terram PW1 Trackbed separator is suitable for use in good quality granular formations, as well as clays and silts formations in conjunction with a sand blinding.

Key features and benefits of the PW1 include:

  • High strength and elongation at break to maintain separation and extend ballast life
  • Mechanical bonding and thermal treatment for high abrasion and puncture resistance
  • Approved for use by Network Rail under Product Acceptance Certificate PA05/04556

The result

The TERRAM PW1 trackbed separator will help ensure the Beaulieu Park station trackbed remains stable and perform well over the lifetime of the infrastructure. This supports the project’s goals of providing sustainable transportation options and easing congestion in the Chelmsford area.

Related PW1 Trackbed Separator Case Studies

PW1 TRACKBED SEPARATOR – Standedge Railway Tunnel (Network Rail)

PW1 TRACKBED SEPARATOR – Scunthorpe Railway Station (Network Rail)

Discover Product Range

Related Case Studies