RG7 ROBUST GEOTEXTILE – Basal-cell-liner protection & side-slope protection (Beacon Hill)
Overview
Project
Basal-cell-liner protection & side-slope protection/drainage
Location
Beacon Hill, Dorset
Client
Suez Environnement (before: SITA UK Ltd)
Consultant
Egniol Ltd
Contractor
Ascot Environmental Ltd, Masterlay Ltd
Product
RG7 Robust Geotextile ((6,800m2) & RG-SD7 (17,200m2)
Product
RG7 Robust Geotextile
Application Function
Protection & Drainage
Market Sector
Landfill
Product Solutions
In February 2010 TERRAM RG7 Robust Geotextile protection and TERRAM RG-SD7 drainage geocomposite were supplied to Ascot Environmental as part of their contract with client Suez Environnement (SITA UK) to construct Cell 11 at their Beacon Hill Landfill site in Dorset.
Specialist installer Masterlay Limited installed the Terram NP7 on the basal area of the new cell to provide protection for the geomembrane. TERRAM RG-SD7 was installed on the long side slopes of the new cell to provide combined liner protection and leachate drainage.